home product info brochure download about the company and contact info prices and order

Solar installation photo diary

This solar picture diary is from a Solartwin solar hot water installation in York, England UK. Arriving after breakfast, the solar installation team finished before 3.30pm, with minimal disruption.

Timeline, photo and description

 

8 am

8am
Welcome to the York solar home installation, a picture of the house before the installation.

 

9am

9am
The solar thermal panel is unpacked and ready for assembly.

9.20 am

9.20am

The photovoltaic panel which powers the variable speed pump is attached to the collector panel.

9.40 am

9.40am
The bracket which securely supports the solar panel is ready for attachment

11 am

11am
This photo shows the solar panel's support bracket securely bolted to the roof.


11.30 am

11.30am
The solar hot water pipe holes are carefully drilled into the roof.

1.30 pm

1.30pm
The solar heating panel is secured to the roof brackets. Time to connect the two pipes and the pump inside the house.

3 pm

3pm
With the solar roof panel fully installed the solar water heating system (as a whole) is checked for commissioning.


3.30 pm

3.30pm
Finished in time for afternoon tea!

Back to the top Back to the top

Get your free 10 minute discount solar phone quote today....
Get your free 10 minute discount solar phone quote today....
We can quote (not estimate) for your home by phone! (So no intrusive salesperson visits!)
Click here to request a survey

 

Where to now?
or jump to...
Request a quote
 
 
Name:
Phone:
House No:
Post Code:
Own home?
 

Testimonials

New! Download training seminar presentation

Solar best practice guide - download here

 
 
British Photovoltaic Association Member
Renewable Energy Association Member

AECB Member

AECB Member
Micro Power Members
Copyright © 2007 Solar Twin Ltd | Company Registration No: 3750291 | Registered Address: 9 Abbey Square, Chester, CH1 2HU